Globalink Logistics has again set high standards in project logistics with its latest achievement in transporting oversized cargo for the Nurek Hydro Power Project in Tajikistan.
Matching our client’s request for his urgent heavy cargo to be timely delivered to Santos. EZ Link, THLG member in Taiwan, handled 2 pieces of machinery cargo ex Kaohsiung Port in Taiwan to Santos, Brazil via He
Total Movements successfully executed this Door-to-Port Movement of 8 nos./1200 freight tons of ODCs from the supplier's works in India upto the designated discharge port.
Cosmatos Group, THLG member for Greece, planned and executed the intermodal road/sea transport from Salcon site at Thessaloniki city limits to Thessaloniki port.
Allelys, THLG member for the UK, have successfully completed the first delivery, a 327.5te generator, to Progress Power Station in Eye, an Open Cycle Gas Turbine (OCGT) power peaking plant, owned by Progress Power Limited (PPL), a subsidiary busin
Allelys, THLG member for the UK, recently completed the lifting and transportation of a Talgo railcar measuring 13.7m (l) x 2.94m (w) x 3.62m (h) and weighing 20te.
Allelys, THLG member for the UK, have recently completed the successful delivery of a steam turbine generator to the Port of Sutton Bridge, Spalding. The unit weighed 176te and measured 14m long, 4.8m wide and 4.5m high.
Santiago, Chile – Tecniproject, drawing from decades of experience, demonstrated its exceptional capabilities by successfully delivering a 110-ton Speco transforme
Allelys, THLG member for the UK, has successfully completed the 2nd of 3 packages of work for the Dogger Bank B onshore converter station, part of the world’s largest offshore wind farm.