Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in require_once() (line 275 of core/lib/Drupal/Core/Extension/ModuleHandler.php).
JSL Global, THLG member for Qatar, recently coordinated the offloading and transport of a Tunnel Boring Machine from Hamad Port in Qatar to client's site.
Total cargo was 3300 CMB and weighed 1080 MT. Some of the heavier pieces weighed 85 MT and had a width of up to 4.8 meters.
JSL Global Qatar moved the cargo from port to client site by using 20 Low Bed Trailer + 6 Hydraulic Axel + several Flat Bed Trailers. JSL Global was involved in the project considering its local experience in such Tunneling Projects and its past experience in Qatar Rail / Doha Metro projects etc.
JSL offloaded the cargo from vessel using port cranes as well as vessel’s crane.
It was 4 days - 24/7 operation at Hamad Port & client’s site.
JSL Global also arranged for police escort ex Hamad port to client site, along with preliminary route survey etc.