Nico van der Vlist      Fri, 17/05/2019

Van der Vlist recently completed the transport and installation of a brand new cabin trainer for the KLM Training Centre. The project started in Rotterdam Port where the cabin trainer arrived from the United Kingdom. With a length of 15m, a width of 6,25m and a height of 4,35m, this was a complex task for all involved.

Upon arrival, the cabin trainer was lifted by crane from the trailer and placed on a pontoon. Van der Vlist then utilized the river network, delivering by water to Oude-Meer, close to Schiphol. The cabin trainer was then transported by trailer to Schiphol. Van der Vlist then offloaded and installed inside the Training Centre.

Van der Vlist looks back on a spectacular and successful project, and wishes the KLM cabin personnel many years of safe training!

For further information about the services Van der Vlist can offer, please call +31 184 606 600 or send an email to info@vandervlist.com

Photo gallery

Share!