Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in require_once() (line 275 of core/lib/Drupal/Core/Extension/ModuleHandler.php).
Cosmatos Group, THLG member for Greece, was recently awarded the transport of refinery equipment to Thessaloniki Port, Greece.
The shipment includes a pre-heater that measured 21.7 m x 4.43 m x 4.63 m and weighed 170 tons, and a vertical steam generator, which measured 24.3 m x 6.37 m x 6.47 m and tipped the scales at 290 tons.
The challenging transport took months to organise, with regular visits to Thessaloniki port to check feasibility and berthing options.
Our Project Cargo Team managed to pull together a quite challenging transport from ex works till FOB on a small chartered ferry.
There is nothing our Project Team gurus can’t handle!