THLG member in Spain, Del Corona & Scardigli Spain has finalized a delivery of a full renewable energy plant from Spain to Japan. Our Project Cargo department did a fantastic job with the coordination for the past two years.
With 43 partial shipments between containerized and breakbulk cargo, DCS Spain has been involved in the road transports including oversized ones, lashing of the cargo, port operations, and sea freight from the ports of Barcelona, Santander and Valencia to different ports of Japan.
Figures of the project:
- 4 Breakbulk shipments on RoRo vessel, total weight: 240.000 kgs and volume: 860 cbm
- 39 containerized shipments for 2 x 20’OT, 41x OTHC and 12 x 40’ FR (OOG) for a total weight of 440.000 kgs
Cargo highlights:
- 3 x battery: 490 cm x 314cm x 400 cm / 29.000 kgs each
- 2 x: structures: 1600 cm x 456 cm x 240 cm / 32.000 kgs each
- 1 x 20’ FR (OOG) Heat exchanger 1190 cm x 233 cm x 289 cm / 21.000 kgs



