EZ Link Taiwan – Handling of 2 sets of transformers

THLG member EZ Link Taiwan handled 2 sets of transformers via heavy lift vessel from Taichung port in Taiwan to Portland in OR, USA, with dimensions / weight 8.55 x 4.55 x 4.7 m / 1,360 kgs.

EZ Link project team committed to handling loading of cargo from shipside onto vessel in a seamless operation, monitoring all loading procedures at shipside, including:

  • Longshoremen.
  • Careful utilization of forklift to lift-up steel wire sling onto hook/spreader beam/lifting beam respectively, with use of EWP (Elevated Work Platform).
  • Coordination of SPMT truck drivers from warehouse to shipside.
  • Stevedores paying high attention of cargo loading from shipside onto vessel board.
  • Vessel operator monitoring all steps of lashing/dunnage/wedge/bracing and blocking in vessel hatch.

EZ Link professional team carefully monitored the operation at all stages.

The clients in Taiwan / USA were satisfied with EZ Link’s “Timely and Reliable service” as always.

Log In

Privacy Overview
thlg_new_logo_200.jpg

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Necessary

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.